Project Photos
1. Design, Construction, Completion, Testing & Commissioning of Proposed Package NR4 (Northern Region) for Sarawak Water Supply Grid Programme - Stressed Area

WO1 (Trusan) – Process Plant

WO1 (Trusan) – Process Plant

WO1 (Trusan) – Process Plant

WO1 (Trusan) – Process Plant

WO1 (Trusan) – Sedimentation Tank

WO1 (Trusan) – Sludge Scrapper Panel

WO1 (Trusan) – Process Plant

WO1 (Trusan) – Filter Tank

WO1 (Trusan) – Filter Gallery

WO1 (Trusan) – Filter Gallery

WO1 (Trusan) – PAC Tank

WO1 (Trusan) – Pump House

WO1 (Trusan) – Pump House

WO1 (Trusan) – Pump House

WO1 (Trusan) – Electro-chlorination System

WO1 (Trusan) – Electro-chlorination System

WO1 (Trusan) – Electro-chlorination System

WO1 (Trusan) – Electro-chlorination System

WO2 (Merapok) – High Level Tank

WO2 (Merapok) – Pump and Lab Rooms

WO2 (Merapok) – Chemical Room

WO2 (Merapok) – Pump Room

WO2 (Merapok) – Packaged Plant

WO2 (Merapok) – MSB Room

WO2 (Merapok) – Sand Filter

WO2 (Merapok) – Standby Genset

WO2 (Merapok) – WTP and Barracks

WO2 (Merapok) - Barracks

WO2 (Merapok) – Barracks

WO2 (Merapok) – Barracks

WO2 (Merapok) – Off River Storage (ORS)

WO2 (Merapok) - Off River Storage (ORS)

WO3 (Damit) - Booster Pump Station

WO3 (Damit) - Booster Pumps

WO3 (Damit) - Panels

WO3 (Damit) – Booster Pump Room

WO4 (Old Trusan) – Barracks

WO4 (Old Trusan) – Barracks

WO4 (Old Trusan) – Barrack

WO4 (Old Trusan) – Barrack
2. Design, Construction, Completion, Testing & Commissioning of Proposed Package NR3 (Northern Region) for Sarawak Water Supply Grid Programme - Stressed Area

Ulu Merapok – Pump Room

Ulu Merapok – Pump Panel

Ulu Merapok – Pump Room

Ulu Merapok – MSB Room

Ulu Merapok – Genset Room

Ulu Merapok – Genset Room
3. Cadangan Pembangunan (Kediaman) 3 Blok Pangsapuri (35 Tingkat) di atas, Lot 25580, Jalan Persiaran Pertahanan, Kampung Wirajaya, Mukim Setapk, Kuala Lumpur.
- Upgrading of Existing IPS from 48,000 PE to 58,000 PE
4. Cadangan Merekabentuk, Membina Dan Menyiapkan Rumah Pam Berkapsiti 125,000 PE, Sistem Paip Utama Serta Kerja Yang Berkaitan Di Persiaran SP 3, Selangor Cybervalley, Mukim Dengkil, Daerah Sepang, Selangor Darul Ehsan.

Sewage Pump Station

Sewage Pump Station & TNB Substation

Sewage Pump Station

Sewage Pump Station

Sewage Pump Station

Sewage Pump Station
5. Kerja-Kerja Pemasangan Paip 650m dan 750mm Di Daerah Kinta, Perak. Pakej 2 - Kerja-Kerja Memasang Dan Mentauliah Paip 750mm ND CLMS Beserta Kerja-Kerja Yang Berkaitan Dari Rumah Pam ulu Kinta Ke Kolam Tanah Hitam (LL) Mukim Hulu Kinta, Daerah Kinta, Perak Daul Rizuan.

Steel Truss

Launching of Steel Truss

Steel Truss

Steel Truss

Incoming Pipe to Reservoir

Incoming Pipe to Reservoir
6. Project Menaiktaraf Loji Air Layar Di Lubau, Betong, Sarawak.

Plant

Plant

Treated Water Pump Sub Panel

MSB Room

Filter Gallery Pipe

Treated Water Pump (Pump House)

Surge Vessel (Intake)

Tank Resevoir

Filter Tank

Raw Water Pump (Intake)

Generator Room (WTP)

Generator Room (Intake)
7. Decommissioning of Lots 4895 & 5560, Bintulu Aerator Lagoons.

4 units of Aspirator (Before install)

Installing Aspirator

4 units of Aspirator (After install)

Control Panel
8. SBR Plant on Lot 8450 & 8451, Bintulu Town District.

Admin Building

Chlorination Tank

Air Blower House

Air Blower

Genset House

Genset

Odour Removal System

Odour Removal System

Pumping Station

Pumping Station

Primary Mechanical Coarse Screen

Pumps

Equalisation Tank

Equalisation Tank

Equalisation Tank

Secondary Screen Chamber

Sludge Thickening House

Sludge Thickening House
9. Pangsapuri Rimbun – Design, Construct, Install, Testing & Commissioning, hand Over Proposed Sewage Treatment Plant (STP 4,400 P.E)
10. Cadangan Pembinaan Pelabuhan Perikanan Lembaga Kemajuan Ikan Malaysia (LKIM) Di Kampung Tanjung Bako, Kuching Sarawak – Supply, Delivery, Installation and Testing & Commissioning of 500 P.E. Sewage Treatment Plant

Pumping Station

Equalization Tank & Aeration Tank

Pumping Station & Control House

Carbon Filter

Sludge Drying Bed

Settling Tank & Aeration Tank
11. Cadangan Pembinaan Pelabuhan Perikanan Lembaga Kemajuan Ikan Malaysia (LKIM) Di Kampung Tanjung Bako, Kuching Sarawak – Supply, Delivery, Installation and Testing & Commissioning of 250m3/day Waste Water Treatment Plant .

Sludge Dewatering Area

Chemical Tanks & Dissolved Air Floatation (DAF) 1

Sludge Dewatering Area & Dissolved Air Floatation (DAF) 2

DAF & Sludge Holding Tank
12. Construction, Installation, Completion, Testing Comissioning, Handover And Maintenance of Proposed Sewerage Treatment Plant (STP 90,000 P.E.) And Ancillary Works For Cadangan Pembangunan Perumahan Bercampur Dan Perniagaan Di Atas Lot 39, Mukim Beranang, Daerah Hulu Langat, Selangor Darul Ehsan Untuk Tetuan Setia Ecohill 2 Sdn Bhd

Air Blower House

Air Blower

Chlorination House

Sequence Batch Reactor (SBR)

Sequence Batch Reactor (SBR)

Sequence Batch Reactor (SBR)

Sludge Holding Tank

Equalisation Tank

Pumping Station

Pumping Station

Pumps

Secondary Screen Chamber

Secondary Screen Chamber

Secondary Screen Chamber

Grit & Grease Tank

Secondary Mechanical Coarse Screen

Sludge Thickening House

TNB Substation